Estimated installed cost
$45,000 to $85,000
A national ballpark for the pool and install. Size, decking, a heater, a cover, and site prep or grading move the real quote.
Pool type sets the base cost more than anything, because the type decides the material, the install method, and how much site work it takes. Above-ground is the fast, low-cost option. Among inground pools, vinyl-liner is the budget choice, fiberglass installs fast as a single shell, and concrete or gunite is fully custom and costs the most. The calculator prices from the type, then the add-ons and the yard set the final number.
| Type | Ballpark | Notes |
|---|---|---|
| Above-ground | $2,000 to $8,000 | Fastest, no excavation |
| Inground vinyl-liner | $35,000 to $65,000 | The budget inground option |
| Inground fiberglass | $45,000 to $85,000 | Fast install, low upkeep |
| Inground concrete / gunite | $60,000 to $120,000 | Fully custom, any shape |
Decking and patio, a heater, an automatic cover, upgraded lighting and filtration, and code-required fencing all add on top of the pool. A sloped or rocky yard needs grading or retaining work. Permits and inspections count. The calculator gives the base range; the on-site design firms up the full number.
Get a free AI audit. We'll show you where AutoRev's AI coworker answers the calls and books the consults you are missing.
What drives the number, and what the on-site design adds.
An above-ground pool runs about $2,000 to $8,000. Inground pools run higher: $35,000 to $65,000 for a vinyl-liner, $45,000 to $85,000 for fiberglass, and $60,000 to $120,000 for concrete or gunite. The calculator above prices by pool type. Size, decking, a heater and cover, and site prep or grading move the real quote, and concrete pools have the widest range because they are fully custom.
A vinyl-liner pool is usually the lowest-cost inground option to build, though the liner needs replacing every several years. Fiberglass costs more up front but installs fast, since the shell drops in as one piece, and needs the least upkeep. Concrete or gunite costs the most and takes the longest because it is formed and finished on site, but it can be any shape or size. The right pick balances up-front cost, upkeep, and how custom you want it.
The base range is the pool itself. It often does not fully cover decking and patio around the pool, a heater, an automatic cover, upgraded filtration or lighting, fencing that code requires, and any grading or retaining work a sloped or rocky yard needs. Permits and inspections are part of a real quote. These add-ons are why two pool quotes can land far apart.
An above-ground pool can go up in a day or two. A fiberglass inground pool is often installed in a few weeks because the shell is prefabricated. A concrete or gunite pool takes the longest, commonly two to three months, because it is excavated, formed, sprayed, cured, tiled, and finished on site, with inspections along the way and weather delays possible.
Pricing a different job? Try the home service cost calculators for an estimate by trade, or build a customer document with the estimate generator.